Industrial Projects

The Nelson Mail

Industrial Marine Electrical have an Electrical service contract with the Nelson Mail for the main printing press and associated pre-press and collating machinery.  The printing press is powered by two 50 HP DC motors synchronised together and coupled to the drive units of the press.  The automation of the press is achieved using a Siemens PLC interfaced to an operator interface on the control console.

The Nelson Mail site operation is a 16-hour a day, six day a week operation and Industrial Marine Electrical supply an “on call” service to the site.


alliance.png

Alliance Group Nelson Plant

Alliance Group Nelson Plant – 2005 Maintenance Shutdown
We have just completed a seven week programmed maintenance shutdown for the site. We assisted the site’s Chief Engineer with the electrical program four weeks before the shutdown, arranged material to be delivered to site prior to the shutdown and a team of four Industrial Marine Electricians worked six days a week to complete the Electrical work list before the start of the killing season.

We are the preferred Electrical service provider for the Alliance Group, Nelson Plant and our company supplies electrical services for them on a 24-hour call out service to cover the two shifts at the site.

 
Boulder-Bank-Walk.JPG

Nelson City Council

The completion of the Telemetry equipment replacement, of the 46 Nelson City Council sites, over the last two years, was within the allocated budgets. The Intouch SCADA system and field equipment is now maintained by Industrial Marine Electrical under a 3 year maintenance contract

Twenty Sewer Pump Control Panels have been constructed and installed around the area as well as Telemetry upgrades, with three Reservoir systems and PRV control systems installed.